These standardized skids are made not only to ship machine lines, but to reduce labor and material costs in the shipping process for Delkor Systems; and they did just that, boasting a 20% cost reduction by eliminating the use of LVP and a 60% labor reduction by removing the need to engineer a skid for each specific machine line.
The Process
Machine Contact Points
Engineering Drawings